Jimboomba Local Road Upgrades Stage 3
Project overview
The design of the Jimboomba Local Road Upgrades (stage 3) is now complete. It includes changes to sections of Ann Street, Bell Street and Queen Street.
These upgrades mean smoother roads with street lighting, new kerb and channel and improved roadside verges for pedestrians.
This project is being delivered under the Local Roads, Stormwater and Kerb and Channel Upgrade program.
Project outcomes
Improved safety and amenity.
Ward
Division 9
Address
Sections of Queen Street, Ann Street and Bell Street, Jimboomba
Latest update |
Design complete - September 2024 |
---|---|
Documents |
Project features
The design includes:
- kerb and channel (where none previously existed)
- stormwater drainage upgrades including gully pits, pipes and culverts
- road reconstruction and resurfacing throughout the project area
- new driveway entrances
- new street lighting
- service relocations (where necessary)
- finishing works including landscaping, signage and line marking.
Project benefits
The road upgrades will deliver:
- improved road condition and amenity
- street lighting for visibility and safety
- improved roadside verges for pedestrians.
Project timing
The Jimboomba Local Road Upgrades commenced in 2021 and is being delivered in stages across multiple streets.
We will communicate with residents and businesses before works begin to let you know timings and what you can expect.
Stage |
Status |
Locations |
---|---|---|
Stage 1 |
Complete |
Sections of South Street, Nichols Street, John Street, Hill Street and Mary Street.
|
Stage 2 |
Complete |
Sections of Anders Street, Ann Street, Cross Street, Manning Street and Spring Street. Stage 2 involved converting Spring Street to a cul-de-sac. This was to accommodate The Department of Transport Main Roads’ (TMR’s) upgrade plans for Brisbane Street.
|
Stage 3 |
Design complete.
Construction is scheduled for early 2025, subject to weather and construction conditions.
|
Sections of Ann Street, Bell Street and Queen Street |
Project impacts
As the project progresses to construction some temporary changes can be expected.
Temporary impacts
- Changed traffic conditions including reduced speed limits, road or lane closures and detours.
- Increased noise, dust, and vibration.
- Temporary loss of street parking or driveway access.
- Temporary footpath closures.
What are we are doing?
- Traffic controllers will be available during working hours.
- Electronic signs will be installed.
- Lane or path detours may be in place.
- Affected properties will be notified in advance of changes to parking and driveway access, footpath or bus stop relocations, or temporary water, sewer or power interruptions.
Nearby projects
Transport and Main Roads (TMR) works
Ann Street and Bell Street will be converted to cul-de-sacs as part of TMR's Mount Lindesay Highway (Brisbane - Beaudesert), Johanna Street to South Street (Jimboomba) duplication project.
Contact TMR’s project team by:
- email at MountLindesay@tmr.qld.gov.au
- phone on 1800 290 568.
Contact us
If you would like more information or to provide feedback about the project, please:
- call our Project Communications Team on 07 3412 3412
- email us at RoadComms@logan.qld.gov.au
- write to us by addressing your letter to:
Road Infrastructure Delivery
Re: CE17 Jimboomba Local Road Upgrades Stage 3
Logan City Council
PO Box 3226
Logan City DCQLD, 4114
Our project team will respond to community questions as soon as possible.